Las Cruces, NM 88012,2140 Torreon RD
See all 6 photos
Las Cruces, NM 88012,2140 Torreon RD
Las Cruces, NM 88012,2140 Torreon RD
Las Cruces, NM 88012,2140 Torreon RD
Las Cruces, NM 88012,2140 Torreon RD
REQUEST A TOUR If you would like to see this home without being there in person, select the "Virtual Tour" option and your agent will contact you to discuss available opportunities.
In-PersonVirtual Tour
Wed
25
Jun
Thu
26
Jun
Fri
27
Jun
$ 352,650
Est. payment /mo
Save
Pending

2140 Torreon RD Las Cruces, NM 88012

3 Beds

2 Baths

1,716 SqFt


UPDATED:

Key Details

Property Type Single Family Home

Sub Type Single Family Residence

Listing Status Pending

Purchase Type For Sale

Square Footage 1,716 sqft

Price per Sqft $205

Subdivision The Arroyos At Settlers Pass

MLS Listing ID 2500398

Style Contemporary,Historic

Bedrooms 3

Full Baths 2

Year Built 2025

Lot Size 6,098 Sqft

Acres 0.14

Lot Dimensions 0 to .24 AC

Property Sub-Type Single Family Residence

Source lascruces

Property Description

This brand-new Energy Star Certified home features 3 bedrooms, a mudroom, 2 baths, and a 2-car garage, combining style and superior efficiency. Enjoy wood-look tile throughout, tiled showers, granite countertops, stainless steel appliances (including fridge), and stylish cabinet hardware.Designed for energy savings, this home includes 2x6 exterior walls, blown fiberglass insulation, spray foam attic insulation, low-E double-paned vinyl windows, a high-efficiency HVAC system, and an energy recovery ventilator for cleaner air--making it nearly twice as efficient as standard new builds.The open floor plan offers a spacious kitchen with a large island and a dedicated laundry room. The primary suite features double sinks and a generous walk-in closet. Step outside to the covered rear patio. Includes garage door opener with 2 remotes.Experience modern living with outstanding energy efficiency--don't miss this one!

Location

State NM

County Dona Ana

Rooms

Basement None

Kitchen Tile Floor, Refrigerator, Pantry, Island, Granite Counters, Gas Range, Garbage Disposal, Built-in Dishwasher

Interior

Interior Features Open Floorplan

Heating Natural Gas

Cooling Central Air

Fireplace Y

Laundry Utility Room

Exterior

Parking Features Garage Door Opener

Garage Spaces 2.0

Fence Rock

Utilities Available City Gas, El Paso Electric, Impact Fees Apply

Roof Type Pitched,Shingle

Building

Sewer Public Sewer

Water Public

Level or Stories One

Structure Type Frame,Stucco


Listed by The Real Estate Firm
agent

Laura Reynolds

+1(575) 640-9425

GET MORE INFORMATION

Full Name
Phone*
Message

Go tour this home

2140 Torreon RD